Living on the Ceiling

Dennis Moore, Dennis Moore, riding through the land
Another snowy winter has passed and a reasonably early start to spring has led to a beautifully cool summer so far in the Upper Peninsula. We spent a good chunk of the winter (when I wasn’t enjoying skiing on my newly-mended foot) sorting fallen ceiling boards, removing the old nails, and putting them back into place.
We had blown cellulose insulation into the ceiling ourselves, which worked out great until we got to the peak of the ceiling, at which point I had stuffed bags of foam insulation scraps into the open space as best as I could, then holding them in place with squares of blue styrofoam. That was good from the standpoint of not wasting the insulation we had trimmed from the walls in order to fit the logs when doing the inner wall, but not the best from an insulation standpoint – there were gaps between the bags and we wanted a tighter seal.
I figured that since I had to re-do the ceiling, and since the peak was now accessible again, it would be a good idea to do the insulation at the top the way we really wanted it.
I used a spray-foam kit from a big box store – it’s similar to the cans of spray foam that you can get, but covers a lot more area, and comes in the form of two tanks whose contents get mixed together at the spray nozzle. It’s messy work, and requires a respirator and sacrificial clothes, as well as protecting the rest of the house with plastic dropcloths, since tiny droplets of foam get everywhere. I hope to not ever have to do that again. After I was done, the bays between the rafters all had at least six inches of foam in them, sealing the ceiling but good.
It's just a top-gap measure
Once again, I crammed bags of insulation scraps into the bays and locked them into place with blueboard:
Mister Blue Ceiling, please tell us why
Finally, I put back the OSB sheathing and re-spackled the joints, and nailed up the final courses of knotty aspen paneling on the ceiling. As you might imagine, I used stout screws in the top course, to prevent any re-occurrences of fallen ceiling syndrome. You can’t tell that there was ever a ceiling drama now, and the house is better insulated for it.
It's like it never happened - except for the extra months of work...
I started writing this post in June, when the lupins were in high bloom, as you can see from the first picture. Our next task: finish cordwooding the walls!

Lessons Learned

As work has progressed at Nerdwood, there have been times when something didn’t quite turn out right, or didn’t look or function as we expected. These missteps have resulted in having to do things over, which, considering how long this house is taking us to build, can be a bit deflating. I can’t really say I’m surprised this happens; it seems to happen to professionals as well, and we are anything but. Still, these lessons are a bit heartbreaking.

In this post, I’m going to share two instances requiring re-work that occurred this year, one a bit bigger than previous instances, and the other a whole lot bigger. Hopefully the lessons we learned will help others avoid the same mistakes.

Lesson I

The first mistake has been bugging me for nearly two years. When I put in the chimney, as noted in Wood Light/Wood Heat, I struggled with the proper way to flash the chimney. There was not a lot of information available about properly flashing a chimney coming out of a metal roof. Reluctant to cut into our lovely metal roof, I tried a silicone flashing boot designed for bolting on top of the existing roof, and I bolted a metal flashing cone on top of that for good measure.

Unfortunately, when spring came, so did the water, drip-drip-dripping from the ceiling box the chimney goes into. Not a torrent by any means, just a small drip every time there was a decent rain. Argh! Clearly, I would have to figure out a way to lap the metal roofing over the flashing, just like you would with a shingle roof.

With the many tasks last year, I just didn’t find the time to take care of the chimney issue. Finally, this past July, I got up on the roof to see what was going on. In the last post, I mentioned the crazy hard winter we, and much of the country, experienced this past year. When I got up top, I saw that the cricket (snow diverter) I had built was woefully inadequate:

Chirp no more, lil' cricket

It did it’s best, but clearly we need a much taller cricket to protect the full height of the chimney, and avoid this happening again:

No-Fun-House mirror

So, first things first, I had to stop the dripping; we could worry about putting up a new diverter later. First, we purchased another sheet of the same roofing we used originally. Good thing it’s still made! Then, I spent an afternoon with thin cardboard and a pair of scissors, figuring out how to cut and overlap everything so the water would decide to run down the roof instead of into the chimney box. You can’t fight water, but you can persuade it. Another day on the roof with the new sheet of roofing and a bucket o’ tools, and the job was done. Interesting to see how the color of the existing roof has changed over six years.

Sat in your lap

As I write this in October, there has been nary a drop in the house since July, so I believe this did the trick. I also noticed that when I removed the old roofing panel, much to my relief, the decking underneath was in good shape. Not enough water had gotten in to rot out any of the framing or decking. We still need to get that cricket installed before the snow flies.

Lesson II

A week or so after fixing the chimney, we were heading out of town so I could have surgery done on my bum foot. On the way out, we stopped at Nerdwood to have a look at things. When I went inside, I admired our new ceiling, as I had done every time over the past few weeks. As you walk in, you see the living room ceiling first, and today it looked great as always. When I looked at the second-floor ceiling, nothing unusual registered at first. Then a feeling of… wrongness came over me.

I suddenly had a disorienting feeling of being in a dream. I realized I was looking at OSB sheeting on the ceiling, as I had been for the previous three years. As in a dream, I knew that the ceiling was done, but what I saw said that it wasn’t. I fought the cognitive dissonance as I ascended the ladder. Something terrible had happened.

When we put up the ceiling, we used a brad nailer, shooting 18-ga. brads through the tongue of the paneling, into the OSB sheeting. Where there were roof rafters behind the OSB, I made sure to put a brad as well, so it would go through the OSB and into the rafter. The paneling was very tight against the OSB with this method, and it seemed like nothing could dislodge it. I was very wrong about that. The last course, at the apex of the ceiling in the front of the house, had come loose, and row by row, the paneling simply peeled off the OSB like a roll-top desk. About two-thirds of the way down the second-floor portion of the ceiling, several temporary braces had stopped the peeling of the ceiling, leaving one-third left and the rest of the paneling in a jumbled heap on the second floor.

The least it could have done was fall neatly...

Hang in there, Boardy!

That was weeks worth of work, undone in what probably took a few seconds. What’s even worse, we ordered the paneling pre-finished, and many of the fallen boards have unsightly gouges, dents and scrapes on them. They all have useless brads sticking out of them, which will have to be removed in order to re-use the good ones.

Pictures of Matchstick Men

Argh! I did not know that I should have secured the last, highest row by driving proper screws into the boards, through the OSB and into the roof rafters. I knew this coming winter we would be framing above the cordwood, and this framing would secure the top row of paneling into the ceiling, but I also knew the brads would surely hold until then. Well, you can quit calling me Shirley.

One thing that made this less bad than it could have been was that it was the second-floor ceiling that came down, rather than the living room ceiling. Although it’s bigger in area, it was much easier to put up due to the lower ceiling height and the lack of large beams in the way of the scaffolding.

We delayed our trip for an hour or so while I secured what was left of the second-floor ceiling using screws, then secured the top row of the living room ceiling using screws as well. I am not looking forward to de-nailing, sorting and re-installing those boards.

This guy was mightily amused by the drama:

Laugh it up, Red

Ceiling and Shiitake

As spring continues to be sprung, we continue work on the ceiling. By the end of April, we finished the larger of the two sections, the area over the second floor:

Knot bad!

At this point, things get a little trickier. The outer edges of the second floor ceiling will eventually have walls built up to them. You can see where those walls will go in the photo above, between the top of the cordwood walls and the ceiling. Because of this, we didn’t have to worry about keeping a straight edge when we got to the end of a row of paneling; the edges will be covered so we could leave it a bit ragged.

The ceiling in the living room not only has to butt up against the top of the existing cordwood wall, but there are a whole bunch of crazy angles where it does so.

Revenge of the twelve-sided house!

In addition, it’s much higher above the first floor than the section we just finished was above the second floor. This makes for some slow going.

In the meantime, the snow slowly melts from our over-eager winter (340″ of snow at the Big Snow Thermometer, a bit less at Nerdwood). Large bergs of snow calve from the glacier on the roof:

Snowhenge!

By May, we’ve made pretty good progress on the living room ceiling:

Wood on wood on wood!

No snow on the ground means it’s also time to work on the garden. This year, we are inoculating shiitake mushroom logs. The spawn comes in little plugs:

Not all spawn is alien in origin

Lightly coppicing a single cluster of maple trees yielded plenty of logs to drill.

It may not get us into "Fine Mushroom Log" magazine

Holes drilled and plugs inserted, all we do now is keep them moist in the woods all summer. Then next spring, lotsa tasty ‘shrooms for the next three or four years.

Champagne dreams and mushroom wishes

Finally, in mid-July, we nailed in the last ceiling board.

Aspen a long time coming

 

Chiefly Concerning the Ceiling

Some time during the longest February in all of recorded human history, a month in which each weekend was punctuated with an apocalyptic blizzard that made driving out to work on the house a foolhardy proposition, we received a shipment of 1000 square feet of tongue and groove aspen paneling from Keweenaw Specialty Woods. Aspen isn’t considered the most desirable type of tree to harvest around here, but we think it looks pretty good.

Stacks and stacks ...

... and stack and stacks.

It very soon became apparent that this lovely stuff was not going to levitate 20 feet in the air and attach itself to the ceiling, so we had no choice but to get to work. We began on the second floor. First came a painstaking process of measuring and marking on the floor, then transferring the marks to the ceiling with the use of a laser level.

Marking time.

Once that was complete, any remaining gaps in the ceiling insulation were filled in with spray foam. We were then ready to lay up the first course of paneling.

Watch yer fingers.

The planks are nailed into the OSB  with a battery-powered finish nailer, a product with the rather alarming and belligerent moniker “Airstrike.” It’s extremely convenient to work with, compared to the type of nail gun powered by a hose attached to a noisy air compressor. After carefully putting up the first course as straight as possible, it was just a matter of pounding each consecutive row into place with a big rubber mallet (affectionately referred to as the BRM) and nailing it up.

BRM in action.

Good weather for an airstrike.

There are a few details in the ceiling, such as the chimney, which require some individual shaping of the paneling with a hand saw.

A little off the top ...

I know some of you like to see all these details.

Greg filled in the seams in the OSB with spackle to create a vapor barrier between the insulation in the roof and the warm air inside the house.

All that stands between us and condensation.

The aspen planks are in a variety of  lengths, so we are creating a pattern of randomly alternating length, not unlike the “random rubble style” of the log ends in the cordwood walls. Before too long, it’s looking pretty sharp.

Goodbye ugly OSB ...

... hello beautiful aspen panelling.