Finishing the first floor (for now)

Time is getting a bit tight and we’re still working on the first floor walls. Fortunately, three of the south-facing walls are almost all window (to take advantage of free solar heating during the winter), so the “panels” we have to fill in are very narrow indeed. Each one only takes about three batches of mortar as opposed to around eight for the average wall panel. The leftmost window required tiny, tiny logs to fit:

Thin little panels? Or giraffe necks?

Working our way around the house, Clare decided to incorporate a bottle feature in the panel near the front door. The inside bottles will be blue and green – a river in the wall:

Still bottles run deep

Finally on to the fifteenth and final panel on the first floor – the front door panel:

The gateway... To Logs

So, mid-August and we’ve just finished about half the outer wall. Think we’ll finish the second floor before freezing weather hits? Nah, me neither. Looks like we may be doing a lot of cross-country skiing again this coming winter (oh, darn!).

Besides being the “Summer of Mud,” 2009 also seems to be the “Summer of Bees.” They’re everywhere right now – if you stand still you can hear the whole field buzzing with nectar-lapping fuzzballs.

Give us all your pollen...